KONČAR signed an agreement for the construction of SHPP Otočac

The small hydropower plant Otočac is an auxiliary power facility that will enhance the power usability of the river Lika, which feeds the existing hydropower plant Senj.

Yesterday, on 11 October in Otočac, KONČAR – Engineering Ltd. and Male hidre d.o.o signed an agreement for the construction of the small hydropower plant Otočac (SHPP Otočac). The plant is an auxiliary power facility that will enhance the power usability of the river Lika, which feeds the existing HPP Senj. The plant is designed with 1.5 MW connection power and will comprise three independent 500 kW power generation units.

Each power generation unit will consist of a permanent magnet generator, a variable-speed turbine and a static converter for grid connection. The generator and the turbine are the result of an R&D project co-financed by the European Regional Development Fund that resulted in the development of new, eco-friendly products that can be recycled after the end of service life and their operation will not pollute the environment even in the event of an accident. Developed and tested in simulated conditions, this original technical solution uses nanotechnology and also includes a newly-developed continuous remote-control system.

Signing the agreement for the construction of the SHPP Otočac

The product is designed for the global low-head hydropower market, where there are no large dams or water reservoirs, eliminating any adverse environmental impacts. Most of the components, such as the generator, static converter, control system, transformer and switchgear, will be manufactured by KONČAR, and the rest of the equipment will be manufactured in the local market. This type of solution is ideal for future hydropower projects with a dozen or so generators on a low dam or bridge, such as Zagreb on the River Sava project.

Research and development of a submersible generator for low-head hydropower plants allows for greater use of hydropower with minimum environmental impact. This is one of the many ways in which KONČAR contributes to the green transition and one that will boost market share in this business segment.

Stay in the loop and subscribe to KONČAR News

Wondering what’s in our pipeline, curious to learn more about our key export markets, our corporate sustainability and why we believe that people are at the core of our success?

Subscribe to KONČAR News and stay in the loop. Catch up with our latest achievements and successes monthly.

Subscribe
KONČAR Newsletter

Related news

You might also be interested in this news.

Extending track record with 21st consecutive quarter of growth
Finance
Extending track record with 21st consecutive quarter of growth

Robust backlog of EUR 2.15 billion underpins exceptional net profit growth in Q1 2025.

KONČAR volunteers team up for Earth Day action on Medvednica
Sustainability
KONČAR volunteers team up for Earth Day action on Medvednica

Every April 22, Earth Day reminds us of the impact we can make when we come together to protect our planet. 

Continuation of a successful growth trajectory
Finance
Continuation of a successful growth trajectory

The audited financial reports for 2024 once again confirmed year-on-year increases, with all core financial and operational indicators posting double-digit growth rates.